Documentation of 'net.finmath.time.daycount.DayCountConvention_NL_365' Java class
DayCountConvention_NL_365
net.finmath.time.daycount

Class DayCountConvention_NL_365

  • All Implemented Interfaces:
    DayCountConventionInterface


    public class DayCountConvention_NL_365
    extends java.lang.Object
    implements DayCountConventionInterface
    Implementation of NL/365. Calculates the day count by calculating the actual number of days between startDate (excluding) and endDate (including), excluding a leap day (February 29th) if present. The method is only exact, if the two calendar dates are (approximately) on the same time. A fractional day is rounded to the approximately nearest day (since daylight saving is not considered, the notion of nearest may be off by one hour). The day count fraction is calculated using NL/365 convention, that is, the day count is divided by 365.
    • Constructor Summary

      Constructors 
      Constructor and Description
      DayCountConvention_NL_365()
      Create an NL/365 day count convention.
    • Method Summary

      All Methods Instance Methods Concrete Methods 
      Modifier and Type Method and Description
      double getDaycount(java.util.Calendar startDate, java.util.Calendar endDate)
      Return the number of days between startDate and endDate given the specific daycount convention.
      double getDaycountFraction(java.util.Calendar startDate, java.util.Calendar endDate)
      Return the daycount fraction corresponding to the period from startDate to endDate given the specific daycount convention.
      • Methods inherited from class java.lang.Object

        equals, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait
    • Constructor Detail

      • DayCountConvention_NL_365

        public DayCountConvention_NL_365()
        Create an NL/365 day count convention.
    • Method Detail

      • getDaycount

        public double getDaycount(java.util.Calendar startDate,
                                  java.util.Calendar endDate)
        Description copied from interface: DayCountConventionInterface
        Return the number of days between startDate and endDate given the specific daycount convention.
        Specified by:
        getDaycount in interface DayCountConventionInterface
        Parameters:
        startDate - The start date given as a Calendar.
        endDate - The end date given as a Calendar.
        Returns:
        The number of days within the given period.
      • getDaycountFraction

        public double getDaycountFraction(java.util.Calendar startDate,
                                          java.util.Calendar endDate)
        Description copied from interface: DayCountConventionInterface
        Return the daycount fraction corresponding to the period from startDate to endDate given the specific daycount convention.
        Specified by:
        getDaycountFraction in interface DayCountConventionInterface
        Parameters:
        startDate - The start date given as a Calendar.
        endDate - The end date given as a Calendar.
        Returns:
        The daycount fraction corresponding to the given period.

DataMelt 3.0 © DataMelt by jWork.ORG

Ads help maintain this website.