Documentation of 'net.finmath.time.daycount.DayCountConvention_30E_360' Java class
DayCountConvention_30E_360
net.finmath.time.daycount

Class DayCountConvention_30E_360

  • All Implemented Interfaces:
    DayCountConventionInterface


    public class DayCountConvention_30E_360
    extends java.lang.Object
    implements DayCountConventionInterface
    Implementation of 30E/360 and 30E+/360. Calculates the day count of 30E/360 as (endDateYear - startDateYear) * 360.0 + (endDateMonth - startDateMonth) * 30.0 + (Math.min(endDateDay, 30.0) - Math.min(startDateDay, 30.0)) This day count convention is sometime called Eurobond basis or 30/360 ISMA. For 30E/360 we have that:
    • The method getDaycount corresponds to the implementation of the "European method" of Excel function DAYS360, i.e., DAYS360(startDate,endDate,TRUE).
    • The method getDaycountFraction corresponds to the implementation of the "30E/360 method" of Excel function YEARFRAC, i.e., YEARFRAC(startDate,endDate,4).
    The day count of 30E+/360 is that of 30E/360 whenever endDateDay is ≤ 30, otherwise it is that of 30E/360 plus one.
    • Method Summary

      All Methods Instance Methods Concrete Methods 
      Modifier and Type Method and Description
      double getDaycount(java.util.Calendar startDate, java.util.Calendar endDate)
      Return the number of days between startDate and endDate given the specific daycount convention.
      double getDaycountFraction(java.util.Calendar startDate, java.util.Calendar endDate)
      Return the daycount fraction corresponding to the period from startDate to endDate given the specific daycount convention.
      • Methods inherited from class java.lang.Object

        equals, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait
    • Constructor Detail

      • DayCountConvention_30E_360

        public DayCountConvention_30E_360(boolean is30Eplus360)
        Create a 30E/360 or 30E+/360 day count convention.
        Parameters:
        is30Eplus360 - If true, then 30E+/360 is constructed, otherwise 30E/360 is constructed.
      • DayCountConvention_30E_360

        public DayCountConvention_30E_360()
        Create a 30E/360 daycount convention.
    • Method Detail

      • getDaycount

        public double getDaycount(java.util.Calendar startDate,
                                  java.util.Calendar endDate)
        Description copied from interface: DayCountConventionInterface
        Return the number of days between startDate and endDate given the specific daycount convention.
        Specified by:
        getDaycount in interface DayCountConventionInterface
        Parameters:
        startDate - The start date given as a Calendar.
        endDate - The end date given as a Calendar.
        Returns:
        The number of days within the given period.
      • getDaycountFraction

        public double getDaycountFraction(java.util.Calendar startDate,
                                          java.util.Calendar endDate)
        Description copied from interface: DayCountConventionInterface
        Return the daycount fraction corresponding to the period from startDate to endDate given the specific daycount convention.
        Specified by:
        getDaycountFraction in interface DayCountConventionInterface
        Parameters:
        startDate - The start date given as a Calendar.
        endDate - The end date given as a Calendar.
        Returns:
        The daycount fraction corresponding to the given period.

DataMelt 3.0 © DataMelt by jWork.ORG

Ads help maintain this website.